Long-form analysis on how US data centers get built: power, land, permits, supply chain and the companies behind the pipeline.

Power & Grid

Power Is the New Land: Why Interconnection Queues Now Decide Where Data Centers Get Built

Site selection used to start with fiber and cheap acreage. Today it starts with a utility letter. We look at how grid access became the gating factor for the US pipeline.

Oct 17, 2026/9 min read/Editorial Team

Latest Posts

6 posts
Permitting

How a Data Center Moves From Rezoning to Building Permit

A step-by-step walk through the local approvals most large campuses pass through, and where projects usually stall.

Oct 14, 2026/7 min read
Market Analysis

Beyond Northern Virginia: The Secondary Markets Gaining Share

Which states are picking up hyperscale and colocation demand as the traditional hubs run short of power and land.

Oct 10, 2026/11 min read
Supply Chain

Transformers, Switchgear and the Long-Lead Equipment Problem

Why electrical gear lead times shape construction schedules, and how developers are buying ahead to protect energization dates.

Oct 6, 2026/8 min read
Guides

Reading a Data Center Announcement: MW, Phases and What They Really Mean

A plain guide to the numbers in project press releases, from critical IT load to campus capacity and phased delivery.

Oct 2, 2026/6 min read
Power & Grid

On-Site Generation: When Data Centers Bring Their Own Power

Gas turbines, fuel cells and bridging power are moving from backup to primary supply on some campuses. What it changes.

Sep 28, 2026/10 min read
Market Analysis

Who Builds Data Centers? A Look at the General Contractor Landscape

The EPCs and GCs that show up most often across the tracked pipeline, and how the field is changing.

Sep 24, 2026/9 min read

Track every project mentioned on this blog

Developers, contractors, MW capacity and status for projects across all 50 states.

Open Project Tracker